Platform / Design
What happens if we go from four wells to six?
Part of Tessera AI EngineDrop a pad on the map, choose the zones, set the spacing and completion, and score the design against a model before capital is committed.
< 5,000 ft5 to 7,5007,500 to 10,00010,000 to 12,500> 12,500 ft
Questions Tessera answers
Start from the question.
The machinery stays underneath. You ask; Tessera pulls the wells, runs the numbers and shows the map.
- 01Should we develop this section at 4, 6 or 8 wells per zone?
- 02Is a wine-rack or a stacked-stagger better here?
- 03How much do we lose by co-developing next to the 2019 parents?
- 04Where does another 2,000 ft of lateral stop paying?
What you get
Capabilities
Pad planner
Place laterals on a map and in a gunbarrel cross-section, then score every well against the model.
Design sweeps
Sweep density, lateral length, proppant and fluid intensity and see the response surface, not one point.
Spacing and drainage
Measured spacing, drainage overlap and parent-child effects computed for the design, not assumed.
Program planning
Roll pad designs into an annual program with rig, capital and timing constraints.
See your wells and basin in Tessera.
A 30-minute walkthrough on your acreage, your operators or your deal. No slide deck, just the platform.